Qualified Person (Supervision) Services For Contract 912 Design And Construction Of Station At Bukit Panjang And Tunnels For Downtown Line Stage 2
CONTRACT 920QP APPOINTMENT OF CONSULTANT FOR SUPERVISION OF CONTRACT 920 – DESIGN & CONSTRUCTION OF STATION & TUNNELS AT NEWTON FOR DOWNTOWN LINE STAGE 2

Fong

The Downtown Line Stage 2 (DTL2) will be a 16.6 km long, fully underground rail transit system with 12 stations, bored/cut and cover tunnels and a depot. It connects DTL1 station at Bugis and runs along the Bukit Timah Road corridor and terminates at a depot. The 12 stations are located at: Rochor, Little India, Newton, Stevens, Botanic Gardens, Duchess, Sixth Avenue, Blackmore, Beauty World, Hillview, Cashew and Petir (Bukit Panjang). The deport is located at the north end of DTL2 off Woodlands Road at Jalan Gali Batu.

Contract 912 (C912) comprises the design, construction and completion of the station at Bukit Panjang (BKP) with civil defence shelter and its connecting tunnels between contract boundary C911 and C913.

Scope of Works

Fong Consult Pte. Ltd. is engaged by LTA as the Qualified Person for Supervision for this project.

Project Key Data

Client  Main Contractor Contract Value Main Contract Award Date Expected Date of Completion of Contract
LTA Shanghai Tunnel Engineering Co. Ltd 355.7 million 13 Aguest 2009 30 July 2015

 

 

The Downtown Line Stage 2 (DTL2) will be a 16.6 km long, fully underground rail transit system with 12 stations, bored/cut and cover tunnels and a depot. It connects DTL1 station at Bugis and runs along the Bukit Timah Road corridor and terminates at the depot.

This contract 920 is for the design, construction and completion of the station at Newton (NEW), four connecting bored tunnels between the stations at Little India, Newton and Stevens, a 66kV Substation at Halifax Road which includes a cable tunnel connecting the 66kV Substation building to the bored tunnels between the stations at Little India and Newton.

Downtown Line 2 station at Newton under this project will connect and allow interchange with the existing North-South Line Newton Station (NSL NEW) to form the Newton Interchange Station. The works includes the Additions and Alteration Works to the NSL NEW.

Scope of Works

Fong Consult Pte. Ltd. is engaged by LTA as the Qualified Person for Supervision for this project.

Project Key Data

Client Main Contractor Contract Value Main Contract Award Date Expected Date of Completion of Contract
LTA Shanghai Tunnel Engineering Co. Ltd 355.7 million 13 August 2009 30 July 2015